Ferrybridge FM2 Energy from Waste

Nov 19, 2019 | Case Studies

Fire Extinguisher Supply and Maintenance

We were recently tasked with supplying and servicing over 200 fire extinguishers for the new Ferrybridge FM2 energy from waste site. For anyone who has ever drove on the A1 going north you would all have passed the old coal fired powerstation. FM2 is located next to the old powerstation besides its sister station FM1.

Duties

Whilst on FM2 we provided HSE consultancy and fire extinguisher servicing to five companies on the construction site. We have a team of highly experience Health and Safety Advisors and fire extinguisher engineers who between them have worked across the globe. Our most recent locations have consisted of Qatar, Bahrain, Oman, Finland, Sweden and the UAE.

Packages

We can provide Health and Safety and Fire Consultants at short notice across the globe. We offer various packages that consist of three different retainer packages and ad-hoc safety inspections and audits. All of our advisors are NEBOSH qualified to a minimum of TechIosh for safety and TIfireE for fire risk assessors.

Ferrybridge FM2

Over 200 extinguishers for this huge building

Over 1000 contractors on site when it was at its peak!

Site Management Team

  The site management team. Staines Safety Services Director is the fourth from the left with the dark blue t-shirt and bald head!!